The Blog

Tnb Power Purchase Agreement

The new agreements relate to suruhanjaya Tenaga`s LSS Phase 3 (LSS3) tender for the first quarter of 2019 to develop, among other things, LSS transmission-related projects. Tenaga Nasional Bhd (TNB), a Malaysian multinational electricity company, today signed two major solar sales contracts (LSS) with ad hoc entities (SPC) concluded by successful bidders. After its notification to the stock exchange, REPPA regulates Asia Poly`s obligation to sell and deliver, and for the TNB to purchase and accept the renewable energy produced by the company. KUALA LUMPUR (December 17): According to indirect subsidiary Asia Poly Bio Gas Sdn Bhd, Asia Poly Holdings Bhd has entered into a renewable energy purchase agreement (REPPA) with Tenaga Nasional Bhd (TNB). He said the agreement with Redsol had yesterday given a scheduled commercial operating date of December 31, 2019, and regulated the obligations of the parties to sell and buy the energy produced by the plant for 21 years from the date of commercial operation. “AAEs govern the obligation for parties to sell and purchase the energy produced by the facility for a period of 21 years from the date of negotiation, in accordance with the terms set out in the AAEs,” TNB added. KUALA LUMPUR: Tenaga Nasional Bhd (TNB) has signed major solar purchase contracts (LSS) with Redsol Sdn Bhd and Coral Power Sdn Bhd. The latest project, with a capacity of 100 MWAC, awarded to LSS3 Pekan Sdn Bhd , founded by the consortium Beseri Jaya Sdn Bhd and Hanwha Energy Corp Singapore Pte Ltd, is located in Pekan, Pahang. Commercial operation of the three projects is scheduled for December 31, 2021. The first project, with a capacity of 100 MWAC, awarded to Cypark Suria Merchang – an SPC of Cypark Resources Bhd and Impian Bumiria Sdn Bhd – is located in Marang, Terengganu. In a notification to Bursa Malaysia, TNB said yesterday that Redsol would build, own and operate a 30 MW solar facility in Kerian, Perak. The three CFCs are Cypark Suria Merchang Sdn Bhd, Suria Sungai Petani Sdn Bhd Solar Pack and LSS3 Pekan Sdn Bhd, after a notification to Bursa Malaysia today. Asia Poly`s share price has now remained stable at 5.5 months, with a market capitalization of 25.17 million.RM.

“Each of the SPCs will design, build, own, operate and maintain a photovoltaic production facility with the authorized capacity on the proposed site,” said Mr. TNB. Mr. Terrence John Kouju 088 – 282,478 terrencek@sesb.com.my Chief Engineer Sustainable Energy Development, Asset Development, 6th Floor, Wisma SESB, Jalan Tunku Abdul Rahman, 88673 Kota Kinabalu, Sabah, Malaysia. TNB allocates three LSS3 projects with a total capacity of 290.88 MWAC The signing of the AAEs will have a neutral effect on the benefits of the NBTS over the life of the AAEs, as production costs will be fully reflected under the Incentive Regulation mechanism. On 7 October, Asia Poly obtained power clearance from the Sustainable Energy Development Authority Malaysia (SEDA) for a 0.5 MW biogas project in Jeli, Kelantan, which has been in operation for 21 years. The 21-year PPP will be effective if all conditions are met, he said, adding that the project would contribute positively to consolidated earnings and net assets in 2020. There are nine (9) types of standardized renewable energy purchase agreements (REPPAs) under the FiT.